Skip to content

Net Zero Construction · North Wales

Plas Huan, North Wales

A new-build high-end residential scheme, expected to be the first Passivhaus Premium building in the UK.

Project overview

Plas Huan is a new build, high end residential scheme in North Wales. Before Develeco's involvement, the proposal was to construct the building traditionally, to the minimum Building Regulations compliance. Upon engagement, Develeco redefined the project brief in cooperation with the client. The building was reoriented to be south facing and a passive design analysis was undertaken to understand the most energy efficient massing. A TM59 analysis was also undertaken on a room-by-room basis to ensure that daylighting and overheating levels will be in accordance with best practice. Where previously the building was projected to generate approximately 10 tonnes of operational greenhouse gas emissions per annum, the revised building will be operationally net zero, and will achieve True (Whole Life) Net Zero within 25 years. This is achieved through low embodied carbon design principles and a large, south facing solar slate roof which will generate more than twice the building's demand each year, with the surplus exported to the grid through smart battery storage. The scheme is expected to be the first Passivhaus Premium building in the UK. The HVAC solution includes an Air Source Heat Pump with Mechanical Ventilation with Heat Recovery. The construction budget is estimated to be in the region of £1.2m.

Services delivered

  • Project Management
  • Cost Management
  • Contract Administration

Gallery

A closer look

Plas Huan, North Wales — image 1

Have a project in mind?

Tell us what you're planning, we'd love to help bring it forward.